This project arose from The City of Calgary’s water quality policy that commits to a no net increase in sediment loads to the Bow River beyond 20...
Low-lying areas of the municipality are protected from river flooding by perimeter dykes, and rely on a system of ditches, floodboxes and pump stat...
The Barrowtown Pump Station, built in 1975, is the largest drainage pump station in Western Canada. Klohn Crippen Berger is carrying out a comprehe...

The Outfall F7 system conveys stormwat...
Klohn Crippen Berger has planned and designed stormwater and utility improvements for the widening of approximately 5 km of a key transportation co...