Sullivan Mine Emergency Storage Pond - Klohn Crippen Berger Projects

Sullivan Mine Emergency Storage Pond

Client:Teck
Location:Kimberley, BC
Completion Date:2011
Project Highlights:Water Management Plan Update

Teck commissioned an update of the surface water management plan for the closed Sullivan Mine site, focusing on the water management of the Emergency Storage Pond and the potential benefit of constructing an upstream interceptor ditch to reduce inflows to the pond. KCB conducted hydrologic modeling to estimate pond inflows and pond performance for a range of individual design events as well as for a long-term (93-year) simulation of historical climate conditions. KCB also prepared conceptual designs and quantity estimates for interceptor ditch options.

Services:

 

·     Hydrologic analysis

·        Rainfall and snowmelt runoff modeling

·     Conceptual design

·        Quantity estimates