Geoscience

Mount Isa, Queensland, Australia
Modelling the impact of mining operations on surface water and groundwater   Mount Isa Mines...
Logan Lake, BC, Canada
Supporting continued mine production since 1969   Since 1969, KCB and its predecessors have...
Tampakan, Mindanao, Philippines
From concept to feasibility design to environmental and social impact assessment   The Tamp...
Antamina, Peru
Designing water management facilities for the mine life cycle, in the high Andes of Peru   ...
Pilbara, Western Australia, Australia
Hydrogeological investigations at a gold mine in Australia’s Pilbara region   The Nullagine ...
Tom Price, Western Australia, Australia
Located approximately 60 km northwest of Tom Price, the Nammuldi mine consists of several Lenses ...
Morobe Province, Papua New Guinea
The Wafi-Golpu unincorporated joint venture (WGJV) propose to develop the Golpu mineral deposit, ...
New Ireland Province, Papua New Guinea
Klohn Crippen Berger Ltd (KCB) was commissioned by Newcrest Mining Limited – Lihir (NMLL) to unde...
Pilbara, Western Australia, Australia
Klohn Crippen Berger Ltd (KCB) was contracted by Fortescue Metals Group Ltd (FMG) to provide fiel...
Tanami, Northern Territory, Australia
The Browns Range Project is situated approximately 150 km southeast of Halls Creek, Western Austr...
Northern Territory, Australia
Klohn Crippen Berger was commissioned to conduct a series of geochemical assessments on the north...
New Ireland Province, Papua New Guinea
Project Highlights: Newcrest Mining Limited (NML) commissioned Klohn Crippen Berger Ltd (KCB) to...
Mount Polley Mine, BC, Canada
On August 4, 2014, the tailings impoundment at Mount Polley Mine breached, resulting in the relea...
Zamora-Chinchipe, Ecuador
SCOPE OF WORK Geotechnical investigations and geotechnical foundation recommendations for Plan...
Ömnögovi Province, Mongolia
The Oyu Tolgoi Mine is a copper-gold project managed by Ivanhoe Mines Mongolia Inc. with the assi...
Tumbler Ridge, BC, Canada
Klohn Crippen designed and performed construction management for the Shikano North pervious rockf...
Tumbler Ridge, BC, Canada
Since 1982, Klohn Crippen has provided engineering services for the design and construction of th...
Nelson, BC, Canada
Terasen’s high-pressure pipeline is located above the portal of an operating mine. Excavation of ...
Shuswap River, North Okanagan F, BC, Canada
Wilsey Dam was completed in 1928 and it is situated on the Shuswap River between Sugar Lake and M...
Sugar Lake, North Okanagan E, BC, Canada
Sugar Lake Dam is situated on the Shuswap River at the outlet of Sugar Lake and is approximately ...
British Columbia, Canada
Klohn Crippen Berger (KCB) carried out the Environmental Impact Assessment (EIA) and engineering ...
Morrison Lake, Cariboo G, BC, Canada
Klohn Crippen Berger (KCB) carried out the completion of the environmental studies required to ob...
KSM Project
Klohn Crippen Berger (KCB) provided engineering design of the Tailings Management Facility (TMF) ...
Lihir Island, Papua New Guinea
Lihir Island is formed around five extinct volcanoes. The three ore bodies, Minifie, Lienetz and ...
Sudbury, ON, Canada
Inco owns and operates numerous mining properties in the Sudbury, Ontario area including ancillar...
Southeast Queensland, Australia
Groundwater monitoring for an LNG project in Surat Basin, Queensland, Australia The Australia Pa...
Ashcroft, BC, Canada
Client: Canadian National Railway Project Highlight: 80 m-long rock shed On November 25th, 2012 ...
Showing 27 results