Heavy Rail

Mufford Crescent, Langley, BC, Canada
Klohn Crippen Berger (KCB) provided design services to the BC Ministry of Transportation, as a su...
St. Clair River, St. Clair County, MI, United States
The original St. Clair River Tunnel was completed in 1891 between the province of Ontario, Canada...
Lac la Biche, AB, Canada
Klohn Crippen Berger (KCB) was contracted to provide engineering support for implementation of a ...
41B Street, Delta, BC, Canada
The BC Ministry of Transportation & Infrastructure retained Klohn Crippen Berger for prelimin...
Ashcroft, BC, Canada
Client: Canadian National Railway Project Highlight: 80 m-long rock shed On November 25th, 2012 ...
Showing 5 results