Hydropower

Latchford Dam
The Latchford Dam in Ontario is scheduled to be replaced in the near future and a private develop...
Sulawesi, South Sulawesi, Indonesia
In November 1994, a Klohn Crippen Berger joint venture was awarded the contract to carry out a fe...
Seymour Falls Dam, North Vancouver, BC, Canada
The Greater Vancouver Water District (GVWD)'s Seymour Falls Dam is a key component in the water s...
Zeballos Lake, Comox-Strathcona G, BC, Canada
Klohn Crippen Berger (KCB) was retained to review the generation potential estimates and provided...
Alberta, Canada
Klohn Crippen Berger (KCB) was retained to design a 7.0 MW run-of-canal hydro plant in southern A...
Mayo, Yukon Territory, Canada
Klohn Crippen Berger (KCB) performed a dam safety review of Mayo and Wareham Dams for Yukon Energ...
Waneta Dam, Kootenay Boundary A, BC, Canada
The Waneta Expansion Project (WAX) will provide a new facility on the right bank of the Pend d’Or...
Snoqualmie Falls, Snoqualmie, WA, United States
Puget Sound Energy (PSE) owns and operates the Snoqualmie Falls Hydroelectric Facility located ne...
56.195003,-120.9163557
The Site C Clean Energy Project (Site C), located on the Peace River 7 km southwest of Fort St. J...
Nam Theun River, Bolikhamsai, Laos
The Nam Theun 2 Hydroelectric Project is the most important project in a long-term collaborative ...
Klinaklini Lake, BC, Canada
Klohn Crippen Berger (KCB). was retained by Kleana Power Corporation to prepare a basic design fo...
Upper Arrow Lake, BC, Canada
The hydroelectric potential of the Keenleyside Dam remained untapped for 34 years. This changed i...
Alameda, Saskatchewan, Canada
The Alameda Dam experienced foundation deformations during construction, which continued at a red...
Castlegar, BC, Canada
Brilliant Expansion Power Corporation, owned by Columbia Basin Trust and Columbia Power Corporati...
Aeneas Lake, Okanagan-Similkameen, BC, Canada
The project consists of the rehabilitation of an existing earthfill dam currently out of operatio...
Showing 15 results