Oil and Gas

Queensland, Australia
The objective of the injection modelling project was to evaluate the ratio of coal seam gas (CSG)...
Queensland, Australia
This project involved a regional assessment of bore condition and groundwater quality, undertaken...
Queensland, Australia
Origin Energy Ltd (Origin) is planning to conduct several trials into the injection of treated co...
Chetwynd, BC, Canada
In August of 2001, Westcoast Energy Incorporated retained the services of Klohn Crippen Berger (K...
Alberta, Canada
Klohn Crippen Berger’s scope of work has included supervising cut and caps, organizing and conduc...
Alberta, Canada
Klohn Crippen Berger (KCB) conducted groundwater level monitoring and sampling of monitoring well...
Alberta
Klohn Crippen Berger (KCB) coordinated and supervised surface reclamation of the Talisman pipelin...
Alberta, Canada
AltaGas contracted KCB in 2005 to conduct a Phase II Environmental Site Assessment (ESA) to delin...
Greenview, Calgary, AB, Canada
Klohn Crippen Berger (KCB) was requested to investigate terrain and subsurface conditions, as a b...
Sandstone Creek Alberta, Canada
Project Highlights: Successful open cut with isolation of Sandstone Creek Habitat enhancement ...
Northwestern Alberta, Canada
The Pembina River crossing is located northwest of Edmonton, Alberta, on a section of river where...
Firebag River, Wood Buffalo, Alberta, Canada
Since commissioning of the SAGD Facility in 2004, surface water collected during periods of large...
Southeast Queensland, Australia
The Australian Pacific Liquefied Natural Gas (APLNG) Project involves the production of Coal Seam...
Showing 13 results