Klohn Crippen Berger Ltd.

Environmental Projects
Coquitlam Landfill Leachate Reduction Investigation
Client: Greater Vancouver Sewerage and Drainage District

Location: Coquitlam, British Columbia

Completion Date: 2004

Project Highlights: Surface and Groundwater Investigation

Klohn Crippen Berger provided environmental consulting services to the GVSDD to evaluate leachate reduction alternatives for the Coquitlam Landfill. Leachate daily flows and landfill cover construction details and characteristics were reviewed and correlated to local precipitation data to determine inflows and outflow sources of the local landfill water balance. Surface water surplus was modelled using the Thornthwaite Mather water balance model, while groundwater was modelled using SEEP/W and SURFER. Five leachate reduction options involving surface water and groundwater management were evaluated and ranked based on a ten-year payback cost/benefit analysis.

Services:
  • Surface water and groundwater modeling
  • Landfill leachate reduction options
  • Cost/benefit analysis
HOME | SITE MAP | FTP SERVER | CONTACT US
Copyright Klohn Crippen Berger Ltd. All Rights Reserved