Projects

Mount Isa, Queensland, Australia
Modelling the impact of mining operations on surface water and groundwater   Mount Isa Mines...
Logan Lake, BC, Canada
Supporting continued mine production since 1969   Since 1969, KCB and its predecessors have...
Calgary, AB, Canada
Improving slope stability using bioengineering   From 2014 to 2017, KCB worked with the City...
Esquimalt, BC, Canada
Rehabilitation of the largest civilian dry dock on the west coast of the Americas   Since 19...
Glenmore Dam
Upgrades to a major dam in Calgary to increase its resiliency during droughts and floods   T...
Tampakan, Mindanao, Philippines
From concept to feasibility design to environmental and social impact assessment   The Tamp...
Antamina, Peru
Designing water management facilities for the mine life cycle, in the high Andes of Peru   ...
Pilbara, Western Australia, Australia
Hydrogeological investigations at a gold mine in Australia’s Pilbara region   The Nullagine ...
Western Province, Papua New Guinea
Over 30 years of mine waste management at copper-gold mine in Papua New Guinea   The Ok Tedi...
Mayerthorpe, AB, Canada
Klohn Crippen Berger was retained by CN Rail to complete the redesign of the grade, track, and br...
Tom Price, Western Australia, Australia
Located approximately 60 km northwest of Tom Price, the Nammuldi mine consists of several Lenses ...
Morobe Province, Papua New Guinea
The Wafi-Golpu unincorporated joint venture (WGJV) propose to develop the Golpu mineral deposit, ...
New Ireland Province, Papua New Guinea
Klohn Crippen Berger Ltd (KCB) was commissioned by Newcrest Mining Limited – Lihir (NMLL) to unde...
Pilbara, Western Australia, Australia
Klohn Crippen Berger Ltd (KCB) was contracted by Fortescue Metals Group Ltd (FMG) to provide fiel...
Tanami, Northern Territory, Australia
The Browns Range Project is situated approximately 150 km southeast of Halls Creek, Western Austr...
Northern Territory, Australia
Klohn Crippen Berger was commissioned to conduct a series of geochemical assessments on the north...
New Ireland Province, Papua New Guinea
Project Highlights: Newcrest Mining Limited (NML) commissioned Klohn Crippen Berger Ltd (KCB) to...
Mount Polley Mine, BC, Canada
On August 4, 2014, the tailings impoundment at Mount Polley Mine breached, resulting in the relea...
Zamora-Chinchipe, Ecuador
SCOPE OF WORK Geotechnical investigations and geotechnical foundation recommendations for Plan...
Ömnögovi Province, Mongolia
The Oyu Tolgoi Mine is a copper-gold project managed by Ivanhoe Mines Mongolia Inc. with the assi...
Tumbler Ridge, BC, Canada
Klohn Crippen designed and performed construction management for the Shikano North pervious rockf...
Tumbler Ridge, BC, Canada
Since 1982, Klohn Crippen has provided engineering services for the design and construction of th...
High River, AB, Canada
The Women’s Coulee Diversion Project is an integral component of the Little Bow River regional wa...
Coronach, SK, Canada
Morrison Dam is an 1830 m-long, 17 m-high earthfill dam situated in southern Saskatchewan on the ...
Fort McMurray, AB, Canada
Klohn Crippen Berger (KCB) was contracted to design Shell Canada Energy’s (SCE) flagship Jackpine...
Fort McMurray, AB, Canada
Civil and infrastructure design are key services that KCB provides to our various Clients.  KCB e...
Fort McMurray, AB, Canada
Klohn Crippen Berger (KCB) has an experienced and internationally recognized team of dam safety e...
Fort McMurray, AB, Canada
Klohn Crippen Berger Ltd. (KCB) has a long tradition of excellence in geologic and geotechnical d...
Fort McMurray, AB, Canada
The Client required the coarse sand tailings (CST) line at its Oil Sands facility to be twinned i...
Fort McMurray, AB, Canada
Klohn Crippen Berger (KCB) is providing geotechnical design and construction support for several ...
Showing 1 - 30 of 123 results