Kemess North Copper / Gold Project

British Columbia, Canada

Klohn Crippen Berger (KCB) carried out the Environmental Impact Assessment (EIA) and engineering designs for the mine rock dumps and tailings storage for this proposed open pit gold/copper mine. The project involved storage of mine rock and tailings in Duncan Lake, which included a 90 m-high rockfill dam.

The project went to a full Comprehensive Environmental Assessment with a joint federal and provincial regulatory process.  The project also proceeded with a Joint Panel Review, which included numerous public hearings.

KCB completed the feasibility study and EIA for storage, operation, and closure of the mine waste facilities that includes sub-aqueous disposal. The services included ARD/ML assessment of 800 Mt of mine rock and development of site-specific water quality objectives.

Kemess North 2 3 years ago
Kemess North 1 3 years ago
Showing 2 results