Lac La Biche Railway Embankment Stabilization

Lac la Biche, AB, Canada

Klohn Crippen Berger (KCB) was contracted to provide engineering support for implementation of a screw plate anchor repair of a settling railway embankment at mile 204.7 on the Lac LaBiche Sub, just north of Conklin.  This project is a trailing assignment from the overall peat foundation assessment being conducted by KCB.  The method of repair was selected by CN and KCB was asked to facilitate its implementation.  A preliminary step of an investigation and trial installation of screw plate anchors was introduced by KCB to permit a more reasoned design approach.

Lac La Biche 3 years ago
Showing 1 result