Klohn Crippen Berger (KCB) coordinated and supervised surface reclamation of the Talisman pipeline right-of-way (ROW) and development of an adjacent fire-break within the CFB/ASU Wainwright Range and Training Area.

The project work scope included restoring adequate soil cover on the pipeline ROW and replacing the 30 m-wide bare-earth fireguard with a 60 m-wide vegetated fire-breaks. Two pipeline crossings were also repaired and reclaimed. KCB provided vegetation monitoring at the CFB Wainwright pipeline ROW.

Services:

  • Vegetation assessments
  • Coordinating and supervising mowing
  • Environmental remedial planning
  • Soil remediation