Fort McMurray, AB, Canada
Klohn Crippen Berger (KCB) designed an External Tailings Facility (ETF) located at our client’s o...
Fort McMurray, AB, Canada
Project aim is to operate a large oil sands open-pit mining venture located north of Fort McMurra...
Fort McMurray, AB, Canada
Our Oil Sands client is constructing and is scheduled to operate a large oil sands open-pit minin...
Fort McMurray, AB, Canada
Klohn Crippen Berger has provided pitwall detailed design as well as designed and implemented the...
Calgary, AB, Canada
Flow in the Elbow River fluctuates significantly and the flood of June 2013 within the Bow and El...
Fort McMurray, AB, Canada
The dam will be constructed within an existing valley, abutting natural high topography and again...
Latchford Dam
The Latchford Dam in Ontario is scheduled to be replaced in the near future and a private develop...
Bow River, AB, Canada
In the days leading up to June 20, 2013, Southern Alberta experienced heavy rainfall that trigger...
Pinchi Lake, BC, Canada
The Pinchi Lake Mine was a mercury mine, and it had been under care and maintenance since it ceas...
Sulawesi, South Sulawesi, Indonesia
In November 1994, a Klohn Crippen Berger joint venture was awarded the contract to carry out a fe...
Nelson, BC, Canada
Terasen’s high-pressure pipeline is located above the portal of an operating mine. Excavation of ...
Seymour Falls Dam, North Vancouver, BC, Canada
The Greater Vancouver Water District (GVWD)'s Seymour Falls Dam is a key component in the water s...
Shuswap River, North Okanagan F, BC, Canada
Wilsey Dam was completed in 1928 and it is situated on the Shuswap River between Sugar Lake and M...
Sugar Lake, North Okanagan E, BC, Canada
Sugar Lake Dam is situated on the Shuswap River at the outlet of Sugar Lake and is approximately ...
British Columbia, Canada
Klohn Crippen Berger (KCB) carried out the Environmental Impact Assessment (EIA) and engineering ...
Morrison Lake, Cariboo G, BC, Canada
Klohn Crippen Berger (KCB) carried out the completion of the environmental studies required to ob...
Lions Gate Bridge, West Vancouver, BC, Canada
Klohn Crippen Berger (KCB) was retained by American Bridge/Surespan JV to provide design-build en...
Chetwynd, BC, Canada
In August of 2001, Westcoast Energy Incorporated retained the services of Klohn Crippen Berger (K...
Mission, BC, Canada
This 1126 m-long, high-level crossing of the Fraser River features a main crossing comprising a v...
Vancouver Island, BC, Canada
Klohn Crippen Berger was retained to provide the conceptual and detailed design for the replaceme...
Taylor Bridge, Taylor, BC, Canada
Klohn Crippen Berger performed a complete structural and geotechnical evaluation of the 5-span, 7...
Mufford Crescent, Langley, BC, Canada
Klohn Crippen Berger (KCB) provided design services to the BC Ministry of Transportation, as a su...
Annacis Island, Delta, BC, Canada
Klohn Crippen Berger was retained by the BC Ministry of Transportation to provide complete design...
Chilliwack, BC, Canada
The City of Chilliwack, together with the provincial and federal governments, tendered a design-b...
Crowsnest Highway, East Kootenay C, BC, Canada
The Crowsnest Highway is a major arterial link between southern British Columbia and Alberta in C...
Cloverdale, Surrey, BC, Canada
This 410 m-long railway overhead was damaged by a failure of the underlying soft clays, causing l...
Zeballos Lake, Comox-Strathcona G, BC, Canada
Klohn Crippen Berger (KCB) was retained to review the generation potential estimates and provided...
Alberta, Canada
Klohn Crippen Berger (KCB) was retained to design a 7.0 MW run-of-canal hydro plant in southern A...
Mayo, Yukon Territory, Canada
Klohn Crippen Berger (KCB) performed a dam safety review of Mayo and Wareham Dams for Yukon Energ...
Yukon Territory, Canada
Minto Explorations Ltd. is working to expand the existing open pit Minto Mine to extend the mine ...