New Vedder Bridge is launched across the Chilliwack River in BC

April 17, 2017

Hundreds from the community came out on April 11, 2017 to witness the historic event of the new Vedder Bridge being launched across the Chilliwack River in BC, Canada. The move took more than 7 hours to reach the south pier and has been summarized in the video below. KCB provided design management and detailed structural, geotechnical, and hydrotechnical engineering for the new steel arch bridge.