Infrastructure

Mayerthorpe, AB, Canada
Klohn Crippen Berger was retained by CN Rail to complete the redesign of the grade, track, and br...
Glenmore Dam
Glenmore Dam and Reservoir are located on the Elbow River within the City of Calgary. The 320 m l...
Calgary, AB, Canada
Flow in the Elbow River fluctuates significantly and the flood of June 2013 within the Bow and El...
Bow River, AB, Canada
In the days leading up to June 20, 2013, Southern Alberta experienced heavy rainfall that trigger...
Seymour Falls Dam, North Vancouver, BC, Canada
The Greater Vancouver Water District (GVWD)'s Seymour Falls Dam is a key component in the water s...
Lions Gate Bridge, West Vancouver, BC, Canada
Klohn Crippen Berger (KCB) was retained by American Bridge/Surespan JV to provide design-build en...
Mission, BC, Canada
This 1126 m-long, high-level crossing of the Fraser River features a main crossing comprising a v...
Vancouver Island, BC, Canada
Klohn Crippen Berger was retained to provide the conceptual and detailed design for the replaceme...
Taylor Bridge, Taylor, BC, Canada
Klohn Crippen Berger performed a complete structural and geotechnical evaluation of the 5-span, 7...
Mufford Crescent, Langley, BC, Canada
Klohn Crippen Berger (KCB) provided design services to the BC Ministry of Transportation, as a su...
Annacis Island, Delta, BC, Canada
Klohn Crippen Berger was retained by the BC Ministry of Transportation to provide complete design...
Chilliwack, BC, Canada
The City of Chilliwack, together with the provincial and federal governments, tendered a design-b...
Crowsnest Highway, East Kootenay C, BC, Canada
The Crowsnest Highway is a major arterial link between southern British Columbia and Alberta in C...
Cloverdale, Surrey, BC, Canada
This 410 m-long railway overhead was damaged by a failure of the underlying soft clays, causing l...
Fish Creek, Calgary, AB, Canada
Klohn Crippen Berger (KCB) was retained by The City of Calgary to carry out improvements on the S...
Fish Creek Provinicial Park, Calgary, AB, Canada
This project arose from the City of Calgary’s water quality policy that commits to a no net incre...
Pitt Meadows, BC, Canada
Low-lying areas of the municipality of Pitt Meadows are protected from river flooding by perimete...
Barrowtown Pump Station, Abbotsford, BC, Canada
The Barrowtown Pump Station, built in 1975, is the largest drainage pump station in Western Canad...
52nd Street Southeast, Calgary, AB, Canada
Klohn Crippen Berger (KCB) has planned and designed stormwater and utility improvements for the w...
BC, Canada
The 100 km-long Iskut Resource Development Road, was required for access from Highway 37 to the E...
Showing 1 - 20 of 34 results